Scarborough Busway: Environmental Project Report
An Environmental Project Report is being prepared for the Line 3 Busway as part of the Transit and Rail Project Assessment Process Regulation (Ontario Regulation 231/08), which is an environmental assessment process specific to public transit projects. The Environmental Project Report includes detailed studies and evaluation of the potential project impacts as well as proposed measures to mitigate the impacts.
Ahead of the Transit and Rail Project Assessment Process period, the Line 3 Busway project team prepared an Environmental Project Report (EPR) to document the alignment of the project, stop locations, preferred design, and to summarize potential impacts the project may have on the surrounding community and ways to mitigate or minimize those impacts.
A draft copy of the Environmental Project Report is available to the public from August 15 to September 30 by clicking here.
While we aim to provide fully accessible content, there is no text alternative available for some of the content on this site. If you require alternate formats or need assistance understanding our maps, drawings, or any other content, please contact us at (647) 706 – 6487 or arjun.sahota@ttc.ca.
-
Appendices
Appendix A - 1 - Natural Environment Report
Appendix A - 2 - Air Quality Impact Assessment Report
Appendix A - 3 - Socio-Economic and Land Use Study
Appendix A - 4 - Noise and Vibration Impact Assessment
Appendix A - 5 - Cultural Heritage Screening Report
Appendix A - 6 - Transportation Assessment Report
Appendix A - 7 - Stormwater Management Report
Appendix B - 1 - Stakeholder Meeting 1 Summary – June 2021
Appendix B - 2 - Consultation Round 2 Public Survey and Pop-Up Summary – October 2021
Appendix B - 3 - Consultation Round 3 – Public Engagement Summary – December 2024