While
every effort is made to ensure the accuracy of the contents of this site, users
should be aware that due to circumstances beyond our control, it may be
necessary to change the text of documents posted here and therefore no
responsibility will be accepted by the Toronto Transit Commission for
discrepancies which may occur between documents contained on this site and the
formal hardcopy versions presented to the Commission.
If it is necessary to rely on the accuracy of Commission documents the Office
of the General Secretary should be contacted at 393-3698 to obtain a certifed
copy. ONLY HARDCOPY RECORDS CERTIFIED BY THE GENERAL
SECRETARY WILL BE DEEMED TO BE OFFICIAL.
Form Revised: February 2005
TORONTO
TRANSIT COMMISSION
REPORT NO.
MEETING DATE: November 14, 2007
SUBJECT: KIPLING
STATION REDEVELOPMENT
HANDOVER TO GO TRANSIT
RECOMMENDATION
It is
recommended that the Commission:
1. Authorize TTC staff to finalize the handover of
the design and construction responsibilities for the Terminal, the Re-aligned
Facilities and the Parking Lots at Kipling Station to GO Transit as of November
15, 2007 to the satisfaction of the Chief General Manager, in accordance with
the principles set out herein.
2. Rescind its jurisdictional interest in the
portion of the Citys owned land located within Terminal lands, as shown on
Attachment 1.
3. Authorize TTC staff to execute a Memorandum of
Understanding (MOU) with GO Transit, City of Toronto and Mississauga Transit regarding
the roles and responsibilities of the various parties relating to the design,
construction and funding of the Kipling Station Redevelopment on terms and
conditions agreeable to the Chief General Manager.
4. Forward this report to the City of Toronto for
concurrence with this course of action.
FUNDING
Funds for the Kipling Station
Improvements project have been included in TTC 2007-2011 Capital Program under
Project 3.9 Building and Structures, as set out on pages 992a1-a3 and 992b1 of
the Improvement Category, as approved by the City Council on March 7, 2007.
BACKGROUND
The Kipling Station redevelopment is a joint TTC, City, GO Transit and
Mississauga Transit initiative with the following objectives:
·
Redevelopment of
Kipling Station as a major transit hub by constructing a new 14 bay
inter-regional bus terminal for the joint use of Mississauga Transit and GO
Transit;
·
Relocation of
Mississauga Transit bus operations from Islington Station to the new Kipling
Station inter-regional bus terminal will free up certain Bloor\Islington lands
for development. TTC bus operations at Islington Station will be moved to a new
TTC-only bus terminal under a separate TTC project; and
·
Replacement of
commuter parking spaces with the reconfiguration of the existing lots and the
construction of new commuter parking lots at Aukland Road, 915 Kipling and 2
Fieldway.
To date, TTC has been responsible for project
management, design and construction for the full scope of the Kipling Station
Redevelopment project. The design, which is now at the 60% completion
milestone, has been developed in consultation with GO Transit and Mississauga
Transit. The Kipling Station redevelopment cost at the 10% design stage was
estimated to be $35.5 million. The cost estimate at the 30% milestone is for
$37.6 million. The cost increase is due to refinement of the design from 10% to
30%.
DISCUSSION
Following various meetings and discussions among TTC,
MTO, GO Transit, Mississauga Transit and the City staff regarding cost sharing
and project funding arrangements, MTO has confirmed project funding in the
amount of $30 million and Mississauga Transit has committed to fund $5.5
million. This arrangement was based on the 10% milestone estimate of $35.5
million.
At a joint meeting attended by MTO, TTC, GO Transit
and Mississauga Transit held on July 24, 2007, the Province announced
that, as a condition of provincial funding, the majority of the project should
be handed over to GO Transit. Provincial funding will flow through GO Transit,
which will assume responsibility for the majority of the project from the TTC
at a hand over date which is currently set for November 15, 2007. Furthermore,
MTO requires that the City agree to convey assets at Kipling Station to GO
Transit with a value equal to the provincial funding, as part of the funding
arrangement.
In
response to the provincial position, TTC and City staff have developed a draft
Memorandum of Understanding (MOU)
to establish a framework for agreement amongst the City, TTC, GO Transit and
Mississauga Transit. The status of the MOU is discussed later in this report.
The MOU divides the current Kipling Station
design and construction of the project into four areas, as illustrated in the
attachments and as described below:
·
Terminal which is the new inter-regional bus terminal (Attachment
1);
·
Re-Aligned Facilities which includes the re-alignment of facilities
in proximity to the Terminal, including a west passenger pick-up and drop off
(PPUDO), north and west entrances and the north, west and Subway Crescent
parking lots (Attachment 1);
·
Parking Lots which includes new parking lots at 915 Kipling
Avenue and on the east and west sides of Aukland Road north of Dundas Street
West (Attachment 2); (Consideration is also being given to extending the lot
easterly from 915 Kipling Avenue on the hydro corridor lands currently leased
to an automotive sales facility); and
·
East Entrance and East PPUDO which includes a new east entrance and
passenger pick-up and drop-off facility (Attachment 3).
Key principles agreed and are being discussed in
the MOU are summarized below:
Design and Construction
·
GO
Transit will takeover responsibility for project management, design and
construction from the TTC for the Terminal, Re-Aligned Facilities and Parking
Lots as of November 15, 2007. This has been agreed in principle and,
although construction activities are not scheduled to start until mid 2008, a
Handover Plan in the form of a working procedure, has been prepared by TTC to
facilitate the transfer of the design deliverables and documentation to GO
Transit. This Handover Plan will be agreed to by both parties prior to the
transfer of design responsibilities. The handover should be approved in order
that progression to the 100% design stage is not delayed and the transaction
with SNC Lavalin is not impacted. Accordingly, this report recommends approval
of the handover. It should be noted that the MOU cannot be signed until
approval has been provided by all parties, including the City of Toronto. It is
expected that this matter will be before Council in January 2008. If the MOU is
not approved by all parties, the responsibility for implementation will have to
be transferred back to the TTC which could result in delays. This risk will be
managed by the TTC in cooperation with GO Transit to ensure that the
design continues in accordance with the project schedule.
·
TTC
will retain responsibility (i.e. project management, design and construction)
for the East Entrance and East PPUDO and it is projected that the construction
will commence in spring 2008.
Real Estate
·
GO
Transit will own and operate the Terminal, which will be used primarily by
Mississauga Transit, GO Transit and provide access routes for TTC buses to the
existing TTC terminal. The Terminal is located on lands partially owned by the
City and partially owned by Hydro One. The City owned land forms part of an
existing TTC parking lot and an area which forms the easterly portion of Subway
Crescent. This area will be stopped up and closed, and subsequently be conveyed
to GO Transit. The proposed closing date in the MOU for the City lands, within
the boundaries of the Terminal, is June 30, 2008 as the process to close Subway
Crescent is expected to be complete by that date. City staff will be reporting
to City Council on this matter in due course.
·
GO
Transit will arrange directly with Hydro One a purchase or lease of the Hydro
One lands to be occupied by the Terminal and provide an access route for TTC
buses destined to the existing TTC bus terminal. Accordingly, this report
recommends that the TTC agree to rescind its jurisdiction over that portion of
the City lands which form part of the existing parking lot.
·
In
order to satisfy the provincial funding requirement that GO Transit secure assets
equal to the value of the provincial funding, the prospect of GO Transit
acquiring certain City owned properties within the Kipling Station lands, which
are used by the TTC, is being discussed but has not yet been resolved in the
MOU. Any lands conveyed to GO Transit would be immediately leased back to the
City on a perpetual basis for a nominal net rent with the City/TTC being
responsible for all operating costs and taxes. A further report will be
submitted on this matter when the City and TTC staff have fully negotiated the
MOU with GO Transit.
·
Operation
and maintenance agreements between the three transit agencies will be finalized
prior to the opening of the Terminal.
Financial
The financial elements of the MOU
are still being discussed. The position which City/TTC staff have taken are:
·
GO
Transit will secure the provincial project funding and utilize the funding to
reimburse the TTC for costs it has incurred to the date of the handover and to
fund the ongoing costs of the project;
·
The
project funding from Mississauga Transit ($5.5 million) will be provided to the
project and will be applied towards design and construction of the East Entrance
and East PPUDO. The TTC will provide a full accounting with GO Transit being
responsible for any costs in excess of the $5.5 million or any excess funds
being provided to GO Transit for application to the overall Kipling
Redevelopment project;
·
GO
Transit will be responsible to secure the required budget for Kipling Station
with the exception of the $5.5 million provided by Mississauga Transit and will
be responsible for all cost overruns;
·
GO
Transit acknowledges that the TTC and the City have entered into an agreement
with SNC-Lavalin, which includes liquidated damages after June 30, 2011. If the
Kipling Station Redevelopment project is not complete in the time required to
relocate Mississauga Transit from Islington Station, GO Transit will indemnify
TTC and the City for any losses associated with GO Transit assuming
responsibility for the design and construction of the Terminal, Re-aligned
Facilities and Parking Lots.
Once the financial details of the MOU are fully
negotiated, a further report will be submitted to the Commission.
JUSTIFICATION
Handover of the majority of the
responsibility for the design and construction of the project to GO Transit is
a provincial funding requirement and is acceptable to City/TTC staff.
Rescinding the TTC jurisdiction over the portion of the existing parking lot,
to be incorporated into the Terminal, enables City staff to move forward with
the process to declare the land surplus for conveyance to GO Transit.
- - - - - - - - - - - -
October 23, 2007
22-11-5
Attachments:
1 Lands to be Jurisdictionally Rescinded/East Entrance and East PPUDO
2 Terminal Lands and Re-Aligned Facilities