Highway 407 Station Construction
May 09, 2017Art glass splashes colour across roof arches.
Categories:
-
-
Highway 407 Station Construction
Mar 13, 2017Illusion of floating escalator from subway platform to concourse lit by art glass skylight.
Categories:
-
Highway 407 Station Construction
Feb 07, 2017Station names on trainway walls at Toronto Rocket window height.
Categories:
-
Highway 407 Station Construction
Feb 07, 2017Wave ceiling inside new GO Transit bus terminal above escalators leading to subway concourse.
Categories:
-
Highway 407 Station Construction
Feb 07, 2017Terrazzo is one of last big jobs on the subway platform.
Categories:
-
Highway 407 Station Construction
Feb 06, 2017This skylight is part of the public art in the station and brings natural light down to station platform level.
Categories:
-
Highway 407 Station Construction
Jan 30, 2017Signs up for commuter parking, passenger pick up and drop off and GOtransit/YRTViva access.
Categories:
-
Highway 407 Station Construction
Dec 08, 2016The station features direct, seamless transit connections from central subway concourse.
Categories:
-
Highway 407 Station Construction
Oct 26, 2016Fall colours highlight new Black Creek channel south of Highway 407 station access bridge.
Categories:
-
Highway 407 Station Construction
Oct 26, 2016Next layer of 'cool' roof installation at GO bus terminal.
Categories:
-
Highway 407 Station Construction
Oct 26, 2016This large skylight will be completed with coloured art glass panels!
Categories:
-
Highway 407 Station Construction
Oct 26, 2016Landscaping throughout the commuter parking lot continues with trees and sod plantings.
Categories:
-
Highway 407 Station Construction
Jul 11, 2016Velodrome creates open space, brings light to subway platform.
Categories:
-
Highway 407 Station Construction
Jul 11, 2016View of concourse velodrome from top of escalator to platform level.
Categories:
-
Highway 407 Station Construction
Jun 10, 2016Black Creek was relocated and naturalized for the project. Naturalized creek with native plantings is now well established.
Categories:
-
Highway 407 Station Construction
May 30, 2016Inside concourse with elevator, stairs and skylight frame installed, ceiling tile installation in progress.
Categories:
-
Highway 407 Station Construction
May 12, 2016View inside new GO bus terminal, north wing.
Categories:
-
Highway 407 Station Construction
May 12, 2016Velodrome inside station creates dramatic space - natural light coming through large skylight reflected from surface.
Categories:
-
Highway 407 Station Construction
May 12, 2016A 41 metre wide skylight lets light into the station, down to platform level. This skylight is part of art installation for project and will incorporate coloured glass panels.
Categories:
-
Highway 407 Station Construction
Apr 14, 2016Subway track complete through Highway 407 station.
Categories:
-
Highway 407 Station Construction
Apr 08, 2016Stairs from TTC subway concourse to GO Transit bus terminal.
Categories:
-
Highway 407 Station Construction
Apr 01, 2016Frame complete for Highway 407 station skylight art glass installation.
Categories:
-
Highway 407 Station Construction
Mar 29, 2016Great perspective of bright open space inside GO Transit bus terminal.
Categories:
-
Highway 407 Station Construction
Mar 29, 2016Velodrome cladding installation, view from behind escalator.
Categories:
-
Highway 407 Station Construction
Mar 03, 2016First layer of cladding for the ceiling above the escalator opening.
Categories:
-
Highway 407 Station Construction
Mar 03, 2016View down side of escalator connecting concourse to platform with velodrome cladding in progress.
Categories:
-
Tunnel Fit-Out
Feb 22, 2016This is a "Lag-Master" used to tighten nuts on bolts of the rail ties.
Categories:
-
Highway 407 Station Construction
Feb 18, 2016Cladding panels installed on the structural steel beam frame above south escalator.