Dust and Air Monitoring Reports

As part of TTC's commitment to keep the community informed, three air and dust monitoring units were placed at the perimeter of the project site, on Leslie Street and on the roof of the building at 843 Eastern Avenue (east of Leslie Street). Regular updates are recorded. Threshold levels were established by Toronto Public Health and the Ministry of the Environment. The TTC works with both of these agencies to ensure the construction and air quality conditions are safe.

Air and Dust monitoring and daily dust control measures have been implemented. These include: washing the street within work site, watering site roads, avoiding long term stockpiles when possible and tarping stockpiles that are not in use. Other proactive control measures include truck wheel washing, tarping trucks and wet cutting of concrete.

TTC is committed to making dust and air monitoring reports available during construction activity.